"C","快活app官网. Operational Capacity Update Report" "C","Filename: morning_report_20251008_20251008120006000.csv" "C","Report for 10/08/2025" "C","Report generated 11/13/2025 21:34:34 EST" "H","Report Type" "D","Operational Capacity Update Report" "H","Section 1. Report Date","Report Time" "D","10/08/2025","12:00:06" "H","Section 2. Prior Day Peak","Hour Ending","MW" "D","10/07/2025","19","15780" "H","Section 3. Operable Capacity Analysis" "H","Description","MW" "D","A. Capacity Supply Obligation (CSO)",26747 "D","B. Capacity Additions EcoMax > CSO",1662 "D","C. Generation Outages and Reductions (Planned + Forced)",7550 "D","Generation Planned Outages and Reductions",5501 "D","Generation Forced Outages and Reductions",2049 "D","D. Uncommitted Available Generation (Non-fast start)",3180 "D","Uncommitted Available Generation Non-fast Before Peak (Info Only)",1877 "D","E. DRR Capacity",184 "D","F. Uncommitted Available DRR",12 "D","G. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","Highgate",0 "D","NB",-200 "D","NECEC",0 "D","NY快活app官网 AC",-1061 "D","NY快活app官网 CSC",330 "D","NY快活app官网 NNC",0 "D","Phase 2",0 "D","Net Deliveries",-931 "D","H. Total Available Capacity (A+B-C-D+E-F-G)",18782 "D","I. Peak Load Forecast For Hour Ending19",14450 "D","J. Total Operating Reserve Requirement",2109 "D","K. Capacity Required = I + J",16559 "D","L. Surplus = (+) Deficiency = (-) (H - K)",2223 "D","M. Replacement Reserve Requirement",160 "D","N. Excess Commitment Surplus = (+) Deficiency = (-) (L - M)",2063 "D","Section 4. Largest First Contingency MW",1245 "D","Section 5. Annual Maintenance Schedule (A.M.S) Peak Load Exposure MW",15802 "H","Section 6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1494 "D","Ten Minute Reserve Estimate:",1494 "D","Thirty Minute Reserve Requirement:",615 "D","Thirty Minute Reserve Estimate:",2838 "D","Expected Actions of OP 4:",0 "D","Additional Capacity Available from OP 4 Actions:",0 "H","Section 7. Interchange Summary" "H","Description","Import Limit MW","Export Limit MW","Scheduled Contract MW" "D","Highgate",-225,0,0 "D","NB",-625,400,-200 "D","NECEC",0,0,0 "D","NY快活app官网 AC",-1400,1200,-1061 "D","NY快活app官网 CSC",-346,330,330 "D","NY快活app官网 NNC",0,0,0 "D","Phase 2",0,0,0 "H","Section 8. Weather Forecast Summary for the Peak Hour" "H","City","Conditions","Wind","High Temperature (F)" "D","Boston","Rain","N-12",60 "D","Hartford","Partly Cloudy","N-10",62 "H","Section 9. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "H","Number of Units","MW" "D",0,0 "H","Section 10. Report Comments" "D","" "T","46 lines"