"C","快活app官网. Operational Capacity Update Report" "C","Filename: morning_report_20251018_20251018120006000.csv" "C","Report for 10/18/2025" "C","Report generated 10/19/2025 04:24:39 EDT" "H","Report Type" "D","Operational Capacity Update Report" "H","Section 1. Report Date","Report Time" "D","10/18/2025","12:00:06" "H","Section 2. Prior Day Peak","Hour Ending","MW" "D","10/17/2025","19","13486" "H","Section 3. Operable Capacity Analysis" "H","Description","MW" "D","A. Capacity Supply Obligation (CSO)",26747 "D","B. Capacity Additions EcoMax Bid > CSO",831 "D","C. Generation Outages and Reductions (Planned + Forced)",9770 "D","Generation Planned Outages and Reductions",7151 "D","Generation Forced Outages and Reductions",2619 "D","D. Uncommitted Available Generation (Non-fast start)",2694 "D","Uncommitted Available Generation Non-fast Before Peak (Info Only)",1656 "D","E. DRR Capacity",159 "D","F. Uncommitted Available DRR",12 "D","G. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","Highgate",0 "D","NB",-59 "D","NECEC",0 "D","NY快活app官网 AC",-1096 "D","NY快活app官网 CSC",330 "D","NY快活app官网 NNC",-85 "D","Phase 2",0 "D","Net Deliveries",-910 "D","H. Total Available Capacity (A+B-C-D+E-F-G)",16171 "D","I. Peak Load Forecast For Hour Ending19",12710 "D","J. Total Operating Reserve Requirement",1926 "D","K. Capacity Required = I + J",14636 "D","L. Surplus = (+) Deficiency = (-) (H - K)",1535 "D","M. Replacement Reserve Requirement",160 "D","N. Excess Commitment Surplus = (+) Deficiency = (-) (L - M)",1375 "D","Section 4. Largest First Contingency MW",1247 "D","Section 5. Annual Maintenance Schedule (A.M.S) Peak Load Exposure MW",16965 "H","Section 6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1496 "D","Ten Minute Reserve Estimate:",1496 "D","Thirty Minute Reserve Requirement:",430 "D","Thirty Minute Reserve Estimate:",1965 "D","Expected Actions of OP 4:",0 "D","Additional Capacity Available from OP 4 Actions:",0 "H","Section 7. Interchange Summary" "H","Description","Import Limit MW","Export Limit MW","Scheduled Contract MW" "D","Highgate",-225,0,0 "D","NB",-650,400,-59 "D","NECEC",0,0,0 "D","NY快活app官网 AC",-1400,1200,-1096 "D","NY快活app官网 CSC",-346,330,330 "D","NY快活app官网 NNC",-125,125,-85 "D","Phase 2",-2000,1200,0 "H","Section 8. Weather Forecast Summary for the Peak Hour" "H","City","Conditions","Wind","High Temperature (F)" "D","Boston","Clear","SE-7",56 "D","Hartford","Mostly Clear","S-5",57 "H","Section 9. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "H","Number of Units","MW" "D",0,0 "H","Section 10. Report Comments" "D","" "T","46 lines"