"C","快活app官网. Operational Capacity Update Report" "C","Filename: morning_report_20251206_20251206115515000.csv" "C","Report for 12/06/2025" "C","Report generated 12/07/2025 00:11:54 EST" "H","Report Type" "D","Operational Capacity Update Report" "H","Section 1. Report Date","Report Time" "D","12/06/2025","11:55:15" "H","Section 2. Prior Day Peak","Hour Ending","MW" "D","12/05/2025","18","18245" "H","Section 3. Operable Capacity Analysis" "H","Description","MW" "D","A. Capacity Supply Obligation (CSO)",27299 "D","B. Capacity Additions EcoMax > CSO",939 "D","C. Generation Outages and Reductions (Planned + Forced)",3760 "D","Generation Planned Outages and Reductions",975 "D","Generation Forced Outages and Reductions",2785 "D","D. Uncommitted Available Generation (Non-fast start)",4399 "D","Uncommitted Available Generation Non-fast Before Peak (Info Only)",3119 "D","E. DRR Capacity",165 "D","F. Uncommitted Available DRR",12 "D","G. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","Highgate",-225 "D","NB",251 "D","NECEC",0 "D","NY快活app官网 AC",-1451 "D","NY快活app官网 CSC",0 "D","NY快活app官网 NNC",-75 "D","Phase 2",-577 "D","Net Deliveries",-2077 "D","H. Total Available Capacity (A+B-C-D+E-F-G)",22309 "D","I. Peak Load Forecast For Hour Ending18",16940 "D","J. Total Operating Reserve Requirement",2122 "D","K. Capacity Required = I + J",19062 "D","L. Surplus = (+) Deficiency = (-) (H - K)",3247 "D","M. Replacement Reserve Requirement",180 "D","N. Excess Commitment Surplus = (+) Deficiency = (-) (L - M)",3067 "D","Section 4. Largest First Contingency MW",1248 "D","Section 5. Annual Maintenance Schedule (A.M.S) Peak Load Exposure MW",19324 "H","Section 6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1498 "D","Ten Minute Reserve Estimate:",1498 "D","Thirty Minute Reserve Requirement:",624 "D","Thirty Minute Reserve Estimate:",3871 "D","Expected Actions of OP 4:",0 "D","Additional Capacity Available from OP 4 Actions:",0 "H","Section 7. Interchange Summary" "H","Description","Import Limit MW","Export Limit MW","Scheduled Contract MW" "D","Highgate",-225,0,-225 "D","NB",-650,400,251 "D","NECEC",0,0,0 "D","NY快活app官网 AC",-1600,1200,-1451 "D","NY快活app官网 CSC",-346,330,0 "D","NY快活app官网 NNC",-160,160,-75 "D","Phase 2",-2000,1200,-577 "H","Section 8. Weather Forecast Summary for the Peak Hour" "H","City","Conditions","Wind","High Temperature (F)" "D","Boston","Partly Cloudy","SW-7",35 "D","Hartford","Clear","W-7",30 "H","Section 9. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "H","Number of Units","MW" "D",0,0 "H","Section 10. Report Comments" "D","" "T","46 lines"