"C","快活app官网. Next Day Operational Capacity Report" "C","Filename: next_day_operational_capacity_report_20250820_20250819160030000.csv" "C","Report for 08/20/2025" "C","Report generated 08/20/2025 12:43:39 EDT" "H","Section 1. Report Date","Report Time" "D","08/20/2025","00:00:00" "H","Section 2. Operable Capacity Analysis" "H","Description","MW" "D","A. Capacity Supply Obligation (CSO)",26038 "D","B. Capacity Additions EcoMax Bid > CSO",1003 "D","C. Generation Outages and Reductions (Planned + Forced)",2806 "D","Generation Planned Outages and Reductions",1340 "D","Generation Forced Outages and Reductions",1466 "D","D. Uncommitted Available Generation (Non-fast start)",5221 "D","E. DRR Capacity",234 "D","F. Uncommitted Available DRR",12 "D","G. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","Highgate",53 "D","NB",44 "D","NECEC",0 "D","NY快活app官网 AC",-345 "D","NY快活app官网 CSC",330 "D","NY快活app官网 NNC",-24 "D","Phase 2",814 "D","Net Deliveries",872 "D","H. Total Available Capacity (A+B-C-D+E-F-G)",18364 "D","I. Peak Load Forecast For Hour Ending19",14900 "D","J. Total Operating Reserve Requirement",2106 "D","K. Capacity Required = I + J",17006 "D","L. Surplus = (+) Deficiency = (-) (H - K)",1358 "D","M. Replacement Reserve Requirement",160 "D","N. Excess Commitment Surplus = (+) Deficiency = (-) (L - M)",1198 "D","Section 3. Largest First Contingency MW",1247 "D","Section 4. Annual Maintenance Schedule (A.M.S) Peak Load Exposure MW",24803 "H","Section 5. Reserve Summary" "D","Ten Minute Reserve Requirement:",1496 "D","Ten Minute Reserve Estimate:",1496 "D","Thirty Minute Reserve Requirement:",610 "D","Thirty Minute Reserve Estimate:",1968 "D","Expected Actions of OP 4:",0 "D","Additional Capacity Available from OP 4 Actions:",0 "H","Section 6. Interchange Summary" "H","Description","Import Limit MW","Export Limit MW","Scheduled Contract MW" "D","Highgate",-225,60,53 "D","NB",-650,400,44 "D","NECEC",0,0,0 "D","NY快活app官网 AC",-1400,1200,-345 "D","NY快活app官网 CSC",-346,330,330 "D","NY快活app官网 NNC",-125,125,-24 "D","Phase 2",-2000,1200,814 "H","Section 7. Weather Forecast Summary for the Peak Hour" "H","City","Conditions","Wind","High Temperature (F)" "D","Boston","Rain","E-10",62 "D","Hartford","Rain","E-9",62 "H","Section 8. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "H","Number of Units","MW" "D",0,0 "H","Section 9. Report Comments" "D","" "T","46 lines"