"C","快活app官网. Next Day Operational Capacity Report" "C","Filename: next_day_operational_capacity_report_20251005_20251004153550000.csv" "C","Report for 10/05/2025" "C","Report generated 10/04/2025 22:45:18 EDT" "H","Section 1. Report Date","Report Time" "D","10/05/2025","15:35:50" "H","Section 2. Operable Capacity Analysis" "H","Description","MW" "D","A. Capacity Supply Obligation (CSO)",26747 "D","B. Capacity Additions EcoMax Bid > CSO",922 "D","C. Generation Outages and Reductions (Planned + Forced)",7615 "D","Generation Planned Outages and Reductions",5858 "D","Generation Forced Outages and Reductions",1757 "D","D. Uncommitted Available Generation (Non-fast start)",2803 "D","E. DRR Capacity",168 "D","F. Uncommitted Available DRR",12 "D","G. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","Highgate",-205 "D","NB",-132 "D","NECEC",0 "D","NY快活app官网 AC",-689 "D","NY快活app官网 CSC",330 "D","NY快活app官网 NNC",0 "D","Phase 2",0 "D","Net Deliveries",-696 "D","H. Total Available Capacity (A+B-C-D+E-F-G)",18103 "D","I. Peak Load Forecast For Hour Ending19",14600 "D","J. Total Operating Reserve Requirement",2109 "D","K. Capacity Required = I + J",16709 "D","L. Surplus = (+) Deficiency = (-) (H - K)",1394 "D","M. Replacement Reserve Requirement",160 "D","N. Excess Commitment Surplus = (+) Deficiency = (-) (L - M)",1234 "D","Section 3. Largest First Contingency MW",1245 "D","Section 4. Annual Maintenance Schedule (A.M.S) Peak Load Exposure MW",15802 "H","Section 5. Reserve Summary" "D","Ten Minute Reserve Requirement:",1494 "D","Ten Minute Reserve Estimate:",1494 "D","Thirty Minute Reserve Requirement:",615 "D","Thirty Minute Reserve Estimate:",2009 "D","Expected Actions of OP 4:",0 "D","Additional Capacity Available from OP 4 Actions:",0 "H","Section 6. Interchange Summary" "H","Description","Import Limit MW","Export Limit MW","Scheduled Contract MW" "D","Highgate",-225,100,-205 "D","NB",-625,400,-132 "D","NECEC",0,0,0 "D","NY快活app官网 AC",-1400,1200,-689 "D","NY快活app官网 CSC",-346,330,330 "D","NY快活app官网 NNC",0,0,0 "D","Phase 2",0,0,0 "H","Section 7. Weather Forecast Summary for the Peak Hour" "H","City","Conditions","Wind","High Temperature (F)" "D","Boston","Clear","SE-7",69 "D","Hartford","Clear","S-6",73 "H","Section 8. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "H","Number of Units","MW" "D",0,0 "H","Section 9. Report Comments" "D","" "T","46 lines"