快活app官网

Constraints

Recently Published Constraints Data

Download the latest reports on binding constraints in the Day-Ahead Energy Market and during the operating day.
 

A constraint is the maximum level a transmission system facility (or facilities) can operate to respect the most restrictive of its thermal, stability, and voltage limits. A constraint becomes "binding" when it limits the power flow between locations, which can lead to dispatch of units out of economic-merit order, potentially affecting the spot price.
 

 
Day-Ahead Binding Constraints
More >
Description Timestamp Download
July 01, 2025 06/30/2025 12:27 PM EDT CSV
June 27, 2025 06/26/2025 12:42 PM EDT CSV
June 28, 2025 06/27/2025 12:46 PM EDT CSV
June 29, 2025 06/28/2025 12:26 PM EDT CSV
June 30, 2025 06/29/2025 12:43 PM EDT CSV
 
Preliminary Real-Time Binding Constraints
More >
Description Timestamp Download
Current 06/30/2025 07:00 PM EDT CSV
June 26, 2025 06/26/2025 09:25 PM EDT CSV
June 27, 2025 06/27/2025 09:30 PM EDT CSV
June 28, 2025 06/28/2025 11:50 PM EDT CSV
June 29, 2025 06/29/2025 11:55 PM EDT CSV
 
Preliminary Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 06/30/2025 10:51 PM EDT CSV
June 26, 2025 06/26/2025 11:21 PM EDT CSV
June 27, 2025 06/27/2025 11:21 PM EDT CSV
June 28, 2025 06/28/2025 11:21 PM EDT CSV
June 29, 2025 06/29/2025 11:21 PM EDT CSV
 
Final Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 06/30/2025 12:32 PM EDT CSV
June 26, 2025 06/27/2025 03:07 PM EDT CSV
June 24, 2025 06/27/2025 03:34 PM EDT CSV
June 27, 2025 06/30/2025 12:03 PM EDT CSV
June 28, 2025 06/30/2025 12:13 PM EDT CSV
 
Final Real-Time Five-Minute Binding Constraints
More >
Description Timestamp Download
Current 06/30/2025 12:32 PM EDT CSV
June 26, 2025 06/27/2025 03:07 PM EDT CSV
June 24, 2025 06/27/2025 03:34 PM EDT CSV
June 27, 2025 06/30/2025 12:03 PM EDT CSV
June 28, 2025 06/30/2025 12:13 PM EDT CSV