快活app官网

Constraints

Recently Published Constraints Data

Download the latest reports on binding constraints in the Day-Ahead Energy Market and during the operating day.
 

A constraint is the maximum level a transmission system facility (or facilities) can operate to respect the most restrictive of its thermal, stability, and voltage limits. A constraint becomes "binding" when it limits the power flow between locations, which can lead to dispatch of units out of economic-merit order, potentially affecting the spot price.
 

 
Day-Ahead Binding Constraints
More >
Description Timestamp Download
July 16, 2025 07/15/2025 12:54 PM EDT CSV
July 12, 2025 07/11/2025 12:25 PM EDT CSV
July 13, 2025 07/12/2025 12:23 PM EDT CSV
July 14, 2025 07/13/2025 12:27 PM EDT CSV
July 15, 2025 07/14/2025 12:48 PM EDT CSV
 
Preliminary Real-Time Binding Constraints
More >
Description Timestamp Download
Current 07/15/2025 01:35 PM EDT CSV
July 11, 2025 07/11/2025 11:55 PM EDT CSV
July 12, 2025 07/12/2025 11:55 PM EDT CSV
July 13, 2025 07/13/2025 11:15 PM EDT CSV
July 14, 2025 07/14/2025 09:15 PM EDT CSV
 
Preliminary Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 07/15/2025 04:21 PM EDT CSV
July 11, 2025 07/11/2025 11:21 PM EDT CSV
July 12, 2025 07/12/2025 11:21 PM EDT CSV
July 13, 2025 07/13/2025 11:21 PM EDT CSV
July 14, 2025 07/14/2025 11:21 PM EDT CSV
 
Final Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 07/15/2025 03:04 PM EDT CSV
July 10, 2025 07/11/2025 01:52 PM EDT CSV
July 13, 2025 07/14/2025 11:39 AM EDT CSV
July 11, 2025 07/14/2025 12:43 PM EDT CSV
July 12, 2025 07/14/2025 12:45 PM EDT CSV
 
Final Real-Time Five-Minute Binding Constraints
More >
Description Timestamp Download
Current 07/15/2025 03:04 PM EDT CSV
July 10, 2025 07/11/2025 01:52 PM EDT CSV
July 13, 2025 07/14/2025 11:39 AM EDT CSV
July 11, 2025 07/14/2025 12:43 PM EDT CSV
July 12, 2025 07/14/2025 12:45 PM EDT CSV