快活app官网

Single-Source Contingency

See the 快活app官网. Transmission, Markets, and Services Tariff, Attachment G Procedure to Protect for the Loss of Phase II Imports, which describes the process used by 快活app官网, New York 快活app官网, and PJM to monitor their respective systems and provide the data required by 快活app官网 to calculate import limits on the Phase I/II high-voltage direct-current interconnection between it and Hydro-Qu茅bec Trans脡nergie.

Download a report on single-source contingencies, limits placed on external and generation interfaces in which losing a single piece of equipment could cause a loss of 1,200 or greater megawatts (MW).

The single-source contingency limit is the base limit plus the authorized margin multiplied by the margin sensitivity. The NY Central-East single-source contingency limit is based on the authorized margin divided by the Distribution Factor (0.30). The margin associated with NY Station Voltages has been converted to MW.

Note: The compilation of this data has various origins and is provided for the convenience of the New England market participants. The 快活app官网 does not assume responsibility for the accuracy.

 
Single-Source Contingency
Description Timestamp Download
Current - August 20, 2025 08/20/2025 12:26 PM EDT CSV
August 06, 2025 08/06/2025 11:56 PM EDT CSV
August 07, 2025 08/07/2025 11:56 PM EDT CSV
August 08, 2025 08/08/2025 11:56 PM EDT CSV
August 09, 2025 08/09/2025 11:56 PM EDT CSV
August 10, 2025 08/10/2025 11:56 PM EDT CSV
August 11, 2025 08/11/2025 11:56 PM EDT CSV
August 12, 2025 08/12/2025 11:56 PM EDT CSV
August 13, 2025 08/13/2025 11:56 PM EDT CSV
August 14, 2025 08/14/2025 11:56 PM EDT CSV
August 15, 2025 08/15/2025 11:56 PM EDT CSV
August 16, 2025 08/16/2025 11:56 PM EDT CSV
August 17, 2025 08/17/2025 11:56 PM EDT CSV
August 18, 2025 08/18/2025 11:56 PM EDT CSV
August 19, 2025 08/19/2025 11:56 PM EDT CSV